Projects

Petrochemistry (8)

Show allClose

Sibur Holding

Modernization of ammonia refrigerating unit in section I-3

Design stage: detailed documentation

Year 2011

Sibur Holding

Modernization of isoprene polymerization unit (IP-5) and isoprene synthetic rubber separation unit (IP-6) without expansion. Designing individual scheme for producing rubber SKI-3S

Design stage:detailed documentation

Year 2011

Kazan OJSC «Orgsintez»

Carrying out the project on measures for isopropylbenzol, phenol and acetone production capacity stabilization

Design stage: project documentation

Year 2009

Sibur Holding

Central control board of polymerization processes, separating processes, processes of preparing solutions of solution-polymerized rubber DSSK, SKD, SKD-ND, DST production.

Design stage: project documentation, detailed documentation

Year 2010

Sibur Holding

Transfer of electric power supply of section DK – 1-4 to voltage 380 V. Organization of 2 Packaged Transformer Substations with voltage 6/0,4 kW and distribution devices

Design stage: project documentation

Year 2011

LLC «Biosintez»

Setting-up armatures for division of interplant piping between OJSC «Voronezhsintezkauchuk» and LLC «Biosintez» unit producing chemicals for rubber

Design stage: project documentation

Year 2011

LLC «Biosintez»

Section №21. Technical Modernization of tertiary dodecylmercaptan warehouse

Design stage: detailed documentation

Year 2011

LLC «Biosintez»

Designing fiscal metering system for energy carriers and material flows of unit producing chemicals for rubber (buildings 21, 66, 66а, 67)

Design stage: project documentation

Year 2011

Oil and Gas Treatment (3)

TNK-BP Holding

Modernization RVS-3000 (Vertical Stock Tank) № 1 at UPN (Oil Treatment Plant) «Vakhitovskaya»

Design stage: project documentation, detailed documentation

Year 2011

TNK-BP Holding

Complex of objects of preparation and transport of associated petroleum gas of Donetsko-Syrtovskoe field at OJSC «Orenburgneft» at Orenburg Gas Processing Plant

Design stage: project documentation, detailed documentation

Year 2011

Tatneft

Desulfurization unit reconstruction at Minnibaevo Central Production Facility. Upravlenie Tatneftegazpererabotka .

Design stage:project documentation, detailed documentation

Year 2010

Oil and Gas Processing (11)

Show allClose

ТNК-ВР Holding

Expansion, driving Zaikinsky Gas Processing Plant to the designed capacity output. Branch B

Design stage: detailed documentation

Year 2009

Rosneft

Replacement of run-down equipment at main production units. Technological units of LLC «Novokuibyshevsk Oils and Additives Plant». Improvement notices of supervision agencies

Design stage: project documentation, detailed documentation

Year 2011

Rosneft

Reconstruction of IV effluent drainage of section №7 OJSC «Novokuibyshevsk Oil Refinery»

Design stage: project documentation, detailed documentation

Year 2010

Rosneft

Unit AU-2 reconstruction for the object «Nitrogen production» at OJSC «Novokuibyshevsk Oil Refinery»

Design stage:project documentation, detailed documentation

Year 2010

Rosneft

Construction of electrical substation for nitrogen unit AU-2 for OJSC «Novokuibyshevsk Oil Refinery» for the object «Nitrogen production unit»

Design stage: project documentation, detailed documentation

Year 2011

Rosneft

Local water unit of AKU-1 unit for the object «Complex of isomerization unit with block of preliminary raw materials hydro-treating PGI-DIG/280» at OJSC «Novokuibyshevsk Oil Refinery»

Design stage: project documentation, detailed documentation

Year 2011

Rosneft

Connecting of explosion proof (hopper-shaped) control center of ALOU-AVT-6 mln unit of OJSC «Novokuibyshevsk Refinery» to side utility networks for the object «Unit AVT-11 reconstruction for expansion up to 7,4 mln tons per year»

Design stage: project documentation, detailed documentation

Year 2011

Rosneft

Reconstruction of oil sludge conversion unit of OJSC «Кuibyshev Refinery»

Design stage: project documentation, detailed documentation

Year 2010

Rosneft

Reconstruction and replacement of run-down equipment

Design stage: project documentation, detailed documentation

Year 2009

Rosneft

Modernization of LLC «Novokuibyshevsk Oils and Additives Plant»»

Design stage:detailed documentation

Year 2008

Tatneft

Reconstruction of Bavlynskoy desulfurization unit

Design stage:project documentation, detailed documentationя

Year 2010

Oil Storage (9)

Show allClose

Gazprom

Methanol warehouse at inventory and package contents management of Frolovsky site

Design stage: detailed documentation

Year 2010

Gazprom

Nizhny Tagil oil bulk plant in Sverdlovsk region, Nizhny Tagil, the III Internationale mine area

Design stage: project documentation, detailed documentation

Year 2011

TNK-Industries

Cost estimation of six variants of building bitumen warehouse «Tihoretskoe» for bitumen storage and shiftment

Year 2010

Gazprom

Methanol warehouse at inventory and package contents management of LLC «Volgogradtransgaz» Frolovsky site

Design stage: detailed documentation

Year 2008

Avtovaz

OJSC «Avtovaz» refueling complex

Design stage: detailed documentation

Year 2008

Rosneft

Reconstruction of CJSC «Bryansk-Terminal M» Klintsovskaya oil bulk plant

Design stage:project documentation, detailed documentation

Year 2010

Federal State Unitary Enterprise «Reservstroy»

Reconstruction of light and dark oil tank park with fuel capacity 320000 m3 in the Irkutsk Regionи

Design stage: project documentation

Year 2010

Federal State Unitary Enterprise «Reservstroy»

Reconstruction of light and dark oil tank park with fuel capacity 320000 m3 in the Chita Region

Design stage: project documentation

Year 2010

Rosneft

Development of basic project technical documentation for construction of timing-loading rack of light oil into tail tank wagons at OJSC «Novokuibyshevsk Oil Refinery»

Year 2011

Oil and Gas Transportation (14)

Show allClose

Lukoil

Reconstruction of industrial pipe-line «Oil from UDR to NGSV» at DNS-1 of Yuzhno-Tarasovskoe field

Design stage: detailed documentation, project documentation

Year 2011

Lukoil

Reconstruction of pipe-lines at Korobkovskoe oil field CNDG «Yuzhnyi»

Design stage: detailed documentation, project documentation

Year 2011

Transneft

15 mln. tons oil loading station at Skovorodino station, second construction stage

Design stage: detailed documentation

Year 2010

Transneft

15 mln. tons oil loading station at Skovorodino station

Design stage:project documentation

Year 2010

Transneft

Pressure pipe-line DNS Shumoglinskaya – UPSV Krasnogorodetskaya

Design stage:project documentation

Year 2010

Transneft

cCompressor station unit at UPN «Alakaevskaya». Additional works.

Design stage: detailed documentation

Year 2010

Archangelsk Joint Directorate of Gas-pipes Distribution Networks under Construction

Gas-distribution pipes in Savinsky village of Plesetsky district of Archangelsk region

Design stage: detailed documentation

Year 2010

TNK-BP Holding

Construction of gas utilization unit of Rostashkinskaya UPN and product pipeline «Rostashkinskaya UPN-ZGPP».

Design stage:detailed documentation, project documentation

Year 2011

Archangelsk Joint Directorate of Gas-pipes Distribution Networks under Construction

Gas distribution pipelines and pipelines between villages in Uemsky village of Primorsky district of Archangelsk region

Design stage: detailed documentation

Year 2010

TNK-BP Holding

Reconstruction of Ryabinovaya pump station

Design stage: project documentation, detailed documentation

Year 2011

TNK-BP Holding

Reconstruction of Pasmurovskaya pump station

Design stage: project documentation, detailed documentation

Year 2011

Sibirskaya Internet Company

Automated units of light and dark oil timing loading

Design stage: project documentation

Year 2008

Sibur Holding

Construction and reconstruction of objects of Iuzhno-Balikskaya line operations control station

Design stage: project documentation, detailed documentation

Year 2008

TNK-BP Holding

Construction of gas utilization unit of «Rostashkinskaya UPN» and product pipeline «Rostashkinskaya UPN-ZGPP»

Design stage: project documentation

Year 2010

Research Work (3)

Sibur Holding

Carrying out the inspection and development of technological steps measures for optimization of the work and improvement of quality of rubber at the block of dehydration drying and extraction segregation in the butadiene rubber production at OJSC «Voronezhsintezkauchuk»

Year 2011

Sibur Holding

Inspection for finding out the reasons for decrease in the production of 4,4 dimethyl-dioxane-1,3 with development of recommendations for normalization of section I-6-16 at LLC «Toliattikauchuk»

Year 2011

Sibur Holding

Inspection of existing production of butadiene and all related industries, development of the implementation of investment projects offer «Reconstruction of butadiene production at LLC «Toliattikauchuk» aiming at extension of its capacity to 100 thousand tons per year and all related industries in accordance with raw materials balance» and providing basic data for design

Year 2008

Other Objects (12)

Show allClose

Zheldorremmash

Hot water supply system for workshops of Voronezh locomotive rebuilder branch of OJSC «Zheldorremmash»

Design stage: detailed documentation

Year 2011

CJSC Manufacturing group «Orghim», Nizhny Novgorod

Modernization of turpentine open storage for the production of normalized Extracts «Norman-4»

Design stage: detailed documentation

Year 2012

Central City Hospital of Novokuibyshevsk

Major overhaul of maternity hospital of municipal medical center «Central City Hospital of Novokuibyshevsk», 11 Pirogova street

Design stage: detailed documentation

Year 2010

Construction Department of Novokuibyshevsk city district

Construction of sports and recreation center in 77 quarter of Novokuibyshevsk city district

Design stage: detailed documentation

Year 2010

TNK-BP Holding

Range for construction waste at the extension of Zaikinsky gas processing plant

Design stage: detailed documentation, project documentation

Year 2010

Sibur Holding

Extension of wrapping film production

Design stage: detailed documentation

Year 2010

Sibur Holding

Reconstruction of polyethylene pipes production

Design stageя:detailed documentation

Year 2008

Rosneft

Warehouse 5000 sq.m. with export terminal for storage of packed products

Design stage: detailed documentation

Year 2009

Avtovaz

Fuelling complex

Design stage: detailed documentation, project documentation

Year 2009

Sibur Holding

Construction of BOPP-film production at LLC «Tomskneftehim» site

Design stage: detailed documentation, project documentation

Year 2012

Sibur Holding

Extension of BOPP-film production at LLC «Biaxplen NK» site

Design stage: detailed documentation, project documentation

Year 2012

CJSC «Skado», Samara

Artificial snow-making system of ski-center with capacity of 18 thousand spectators in Rosa Khutor mountain area

Design stage: project documentation

Year 2009

Обсудить ваш проект